Lagoon

The Promenade sweeps down to the Lagoon edge to provide a safe and accessible path of travel that engages visitors meaningfully with the river, with improved sight lines, safer access, more inviting spaces, and improved programming opportunities in an integrated plaza space.

Do you think this design achieves the project goals?
You have 255 characters left.

The survey form is now closed. Thanks for your contributions.

Centre Street: Chinatown

The multi-modal cycle path and promenade in the area west of the Centre Street Bridge will be separated by a low flood wall that can activate the edge of Sien Lok Park with seating, interpretive signage, and other amenities along with planting.

Do you think this design achieves the project goals?
You have 255 characters left.

The survey form is now closed. Thanks for your contributions.

Riverwalk West

The multi-modal promenade will be raised for flood protection and to improve circulation and sight lines. Existing design elements will remain or be reconstructed, maintaining the design and character of RiverWalk, a place that has reshaped how Calgarians engage with the riverfront.

Do you think this design achieves the project goals?
You have 255 characters left.

The survey form is now closed. Thanks for your contributions.

Riverwalk East

Through the eastern stretch of RiverWalk, the existing promenade will be preserved with the flood wall located within softscape areas. Improvements will be made to the Riverfront Ave streetscape with safer crossings, and activated seating and gathering spaces.

Do you think this design achieves the project goals?
You have 255 characters left.

The survey form is now closed. Thanks for your contributions.

Provide your input in a virtual reality tool!

Please click 'here' to provide input in our virtual reality tool! This is an additional tool asking the same questions above but allows users to experience the project in virtual reality.

**Please note this tool will only work in Google Chrome.


NEXT STEPS

Informed by the findings from this engagement, the development of the design details will begin. An information session will be held in 2020 once information about the construction timeline are available.