ABOUT
Stage 1 of Green Line construction will include two elevated stations. The City has worked with architects to develop preliminary station designs for elevated stations. The aesthetic of guideways will be primarily influenced by the infrastructure and construction requirements.
January and February of 2018 we collected input on elements that will connect your community to the station area.
Elevated stations include:
PROVIDE YOUR INPUT
Select a tab below to see how input was collected for that area.
BOULEVARD
Street trees and grasses
Permeable pavers
Natural grasses and trees
STREET FURNISHINGS
Standard city bike lock up
Standard city metal bench
Standard city waste and recycling amenities
PATHWAY
Upgraded sidewalks with street trees and landscaping
Patterned concrete with planted trees
Gravel pathway with native trees and grasses
Paved multi-use pathway with grass lawn
RAILING
Glass and steel railings
Metal picket railing
Punched metal railing
Cable guideway railing
Artist collaboration railing
Weathered steel railing
SOUND WALLS
Patterned composite
Patterned concrete
PORTAL ENTRANCE
Concrete (no railing)
Concrete with fenced railing
Concrete with steel barrier railing
SCREENING WALLS
Metal panel
Patterned composite
Timber panels
Patterned concrete
RETAINING WALLS
Rock, soil, landscaping
Patterned concrete wall
Concrete with climbing plants
Standard concrete form liner
CROSSWALKS
Enhanced surface crossing